I have created a new sheet with a few different logics to replace an old sheet. I want to re-create all entries from the old sheet into the new sheet, but I used the system’s “Create Date” field for the date field, which cannot be edited. How can I back date the entry?
Are you referring to getting each entry’s create date on another date field? If so, please create a new date field, apply the create date [url=Default Values]default value] on the field, save the sheet design, and then execute populate empty values to repopulate the create date on the new date field.